MY ACCOUNT | ||||||
COMPANY | SHOP | CAREERS | TRAINING CENTRE | CONTACT US |
ClientMiron Construction Co., Inc. |
Year Completed2018
|
LocationMuskego, WI
|
Type of ProjectEducational Facility |
ArchitectBray Associates Architects Inc.
|
Pool ConsultantWater Technology Inc. |
Features8-Lane Competition Pool, Starting Blocks, Diving Boards, Accessibility Lift, Colorado Timing System
|
||
SuppliersAsahi America, Aurora, BECS Technology, Bray Canada, Brolain Distributors Ltd., CDS, CLI Industries, Colorado Timing System, Competitor, CRS, Dal Tile, Duraflex, Dutch, Form & Build, George Fischer, Granger, H2Flow Controls, Harrington, Hayward, Hilti, Inlays, IPEX, Jack's Magic, Lawrason's, Lochinvar, Monarch-McLaren, Neptune Benson, Noble, Northern Stainless, Pentair, Power Plant Supply, Q-Products, Recreonics, Spectrum, SR Smith, Stenner, Unistrut, Water & Ice, Zurn
|
Designed by Bray Architects, the $4.7 million Muskego High School project included the demolition and construction of a 5,000 square foot pool and natatorium. Joining forces with Miron Construction Co., Inc., Acapulco Pools completed the construction of the 310,000 gallon competition pool.
The project began with a complete demolition of the existing 6-lane swimming pool, originally built in 1972. In its place, a new 8-lane pool was constructed and includes increased bleacher capacity for up to 400 spectators and 200 athletes as well as two new diving boards. Finally, a new office, timing area, unisex changing/shower rooms, and ample natural light were integrated into the new design and creates a state-of-the art facility for the students and faculty and of Muskego High School along with the local community.