Muskego High School

 

PROJECT SUMMARY


 

Client

Miron Construction Co., Inc.

Year Completed

2018

 

Location

Muskego, WI

 

Type of Project

Educational Facility

Architect

Bray Associates Architects Inc.

 

Pool Consultant

Water Technology Inc. 

Features

8-Lane Competition Pool, Starting Blocks, Diving Boards, Accessibility Lift, Colorado Timing System

 

Suppliers

Asahi America, Aurora, BECS Technology, Bray Canada, Brolain Distributors Ltd., CDS,  CLI Industries, Colorado Timing System, Competitor, CRS, Dal Tile, Duraflex, Dutch, Form & Build, George Fischer, Granger, H2Flow Controls, Harrington, Hayward, Hilti, Inlays, IPEX, Jack's Magic, Lawrason's, Lochinvar, Monarch-McLaren, Neptune Benson, Noble, Northern Stainless, Pentair, Power Plant Supply, Q-Products, Recreonics, Spectrum, SR Smith, Stenner, Unistrut, Water & Ice, Zurn

 

 


 

Designed by Bray Architects, the $4.7 million Muskego High School project included the demolition and construction of a 5,000 square foot pool and natatorium. Joining forces with Miron Construction Co., Inc., Acapulco Pools completed the construction of the 310,000 gallon competition pool. 

 

Indoor competition/lap pool at Muskego High School

 

The project began with a complete demolition of the existing 6-lane swimming pool, originally built in 1972. In its place, a new 8-lane pool was constructed and includes increased bleacher capacity for up to 400 spectators and 200 athletes as well as two new diving boards. Finally, a new office, timing area, unisex changing/shower rooms, and ample natural light were integrated into the new design and creates a state-of-the art facility for the students and faculty and of Muskego High School along with the local community.